Catch planning mistakes before they ship.
Write rules in plain language. Reonic Validation AI runs them against every offer and design and flags anything that breaks the rules, so the customer only ever sees a plan that's right.
The storage at 9.84 kWh is significantly oversized. For this consumption the allowed range is between 1.12 and 3.36 kWh.
RULE Storage capacity has to stay between 0.2 and 0.6 kWh per kWh of daily consumption.
FIX Reduce the storage to a model between 1.12 and 3.36 kWh, or recheck the consumption profile.
Rules you set, checked on every project
Reonic checks your projects against the rules you define, the same way every time. System size, shading, stringing, storage sizing, component compatibility. If something doesn't fit your rules, it's flagged before the offer goes out.
System size
Flag systems that are too small or too large for the customer's consumption.
Shading
Check that shading on the roof has been accounted for in the layout.
Stringing
Catch strings that mix module types or break inverter limits.
Modules per roof face
Hold each roof face to the module count and layout rules you set.
Storage sizing
Make sure storage is dimensioned correctly against the PV system.
Component compatibility
Allow only the inverter, storage, and module combinations you approve.
Write the rules once, in plain language
Your planning standards live in your Reonic knowledge base: how storage is sized against PV, which inverters go with which storage, when an optimiser is needed. Reonic reads those rules, checks projects against them, and your team can ask about any rule in plain language.
Reonic validates every project against them
Your team can ask the assistant what a rule means
AI planning validation
You configure the rules the AI checks your plan against before it's finalised.
Run it on a project, see exactly what's wrong
Open a project and run the validation. Reonic lists every issue with the reason behind it, from a system that's too small to a storage unit that's wrongly sized. Compare two variants side by side and see which one actually holds up before you send it.
Technical and sizing checks in one run
Compare variants before the customer sees them
The storage at 9.84 kWh is significantly oversized. For this consumption the allowed range is between 1.12 and 3.36 kWh.
RULE Storage capacity has to stay between 0.2 and 0.6 kWh per kWh of daily consumption.
FIX Reduce the storage to a model between 1.12 and 3.36 kWh, or recheck the consumption profile.
The constraints every senior planner carries in their head
Applied to every project automatically, no matter who planned it.
Mistakes caught before the customer
A wrong plan gets flagged in Reonic, not in front of the customer or up on the roof.
Consistent quality across the team
Every project is checked against the same rules, no matter who planned it.
Your know-how, encoded as rules
Hard-won experience becomes rules in the system instead of something each planner has to remember.
Less back-and-forth
Fewer corrections bouncing between sales and planning after the offer is already out.
New planners up to speed faster
Newer team members plan to the same standard from day one, with the rules backing them up.
Every project checked the same way
The validation runs the same on the first project of the day and the fiftieth.
What our customers say
Reonic shipped AI features that actually help. One click, and a project is validated against all our company guidelines.
Book a demo. Get to know all products and features.
In a personal product presentation, we'll show you all products and features. Free of charge, no obligation and tailored to your business and needs.
Book a demoIt checks your projects against the planning rules you define, system size, shading, stringing, storage sizing, and component compatibility, and flags anything that breaks them before the offer reaches the customer.
System size against consumption, shading, stringing, modules per roof face, storage sizing against the PV system, and which component combinations you allow. You set the rules to match how your company plans.
From your Reonic settings and your knowledge base, where you keep your planning standards in plain language. Reonic reads them and checks every project against them.
Open a project and run the validation. Reonic returns a list of issues, each with the rule behind it, so you can fix them before sending the offer.
Yes. Run the validation on each variant and see which one holds up against your rules before you decide what to send.
Yes. Because the rules live in your knowledge base, your team can ask the Reonic assistant what a rule means or why a project was flagged.
